Description
8,000 square foot garage facility for 12 ambulances and 5,500 square
foot of office facility with connecting support areas. Scope of
the project included programming, design, documentation, bid review
and construction observation. Features of the building include carbon
monoxide detection devices, exhaust air systems, separation of office
and garage with air lock vestibule, 24 hour dispatch terminal and
emergency standby generator.
Project
was achieved in collaboration with a construction manager. Pre-engineered
building systems were utilized in a creative design, and building
costs were kept under the $50 per square foot budget limitation.
|