|
Description
Three phase addition and renovation program. Phase I consisted of
a pre-engineered steel frame, slab-on-grade multipurpose, music,
classroom and lobby addition to the existing church. New truss pitched
roofs were placed over existing flat roof areas. Work included interior
refinishing and alterations, rooftop HVAC, new electric service
and related mechanical/electrical work. The parking lot was expanded
and connections made to municipal water and sewer services.
A
classroom wing was shelled in for build-out in the future as funds
become available. This potion of the building was a two-story walkout
basement, pre-engineered steel frame, and concrete floor plank construction.
|