First Wesleyan Church
 
 

Location:

Client:

Size:

Cost:

Battle Creek, Michigan

First Wesleyan Church of Battle Creek

5,900 sf

$690,000

 


Description
Church desired an open, inviting fellowship hall addition to their existing building to accommodate socializing before, between, and after scheduled church services. A pre-engineered steel superstructure was used to tie in with existing pre-engineered steel church structure. Interior consisted of drywall and metal stud work and acoustical suspended ceilings. Exposed plumbing, fire suppression, a rooftop HVAC and interior duct revisions were included as was electrical power, lighting, fire alarm, egress and exit lighting and new panel work. Much of the interior work was accomplished by church volunteers
.