|
Description
After putting an addition onto their main building, the Church added
a design-build, unusual, stand-alone facility to house their Youth
Ministries. Design of this pre-engineered, steel building was to
keep below 12,000 S.F. with presently a student load anticipated
in the range of 80 to 150 for grades 9 to 12, and 80 to 150 for
grades 7 and 8. The future addition will allow separate but connected
7-8 facility and 9-12 facility. Total occupancy for first phase
will be in the range of 260 - 300 for concerts and joint programs.
Its angular forms provided a dynamic, creative space for youth to
hang out and create their own style of worship and fellowship.
|